Latest News

September 14th, 2012

Professional construction piling contractors can not only make sure that the foundations of your next project are safe and secure; they can also make sure [...] > Read Full Article

September 7th, 2012

When major infrastructure construction projects are undertaken, it can often be more important than ever to carry out suitable pile testing, in order to [...] > Read Full Article

August 31st, 2012

A Sunday Times report has hinted that a range of underpinning methods may be needed in order to save one of Britain’s most iconic buildings in the [...] > Read Full Article

August 24th, 2012

Underpinning techniques could be put to the test in a whole new way as work to redevelop Battersea Power Station gets underway.
An £8 billion [...] > Read Full Article

August 17th, 2012

We’ve already looked at the piling rigs used in the construction of the sporting venues at the London 2012 Olympic Park – but the site is likely [...] > Read Full Article

read all



Drop Weight Driven Piles

Drop weight
As a specialist piling contractor, we can individually tailor drop weight machines to suit specific locations and operate them in a variety of locations with maximum efficiency and minimum disruption.

Request a quote online now for your project.

Drop weight driven piles are often used on smaller housing developments or locations where access or headroom is limited and other types of piling machine are simply not viable.

Our range of drop weight driven pile machines is comprehensive. As well as diesel powered drop weight machines, we have electric power packs which mean exhaust fumes can be avoided when piling work is being carried out inside existing buildings.

Piling projects present their own unique challenges. Our skilled piling teams can quickly and expertly identify the piling requirements of any location and deliver the most effective piling solution

• 212 mm/ 250 mm/273 mm/323 mm nominal diameter permanently steel-cased piles
• Drives large numbers of high load piles in rapid time
• Suitable where access is very tight
• SWL of up to 450 kN

NO PILING MAT IS REQUIRED ON MOST PROJECTS USING OUR DROP WEIGHT MACHINES !!

 

Subscribe

Subscribe

 

Subscribe to our Mailing List